Striping looks like a simple job. Paint, lines, done.
The cost shows up later, when a layout has to be ground off and relaid because the accessible stall count came out wrong, or when a lot painted in June is already gray by the following spring. Most of what goes wrong on a striping job is decided before anyone opens a paint can.
Here are the five that cost Georgia property managers the most.
1. Getting ADA Parking Requirements Wrong
This is the expensive one, because the fix is rarely a touch-up. Accessible stalls that come up short have to be removed and relaid.
The 2010 ADA Standards set the count by lot size. A lot with 25 total spaces needs 1 accessible space. 26 to 50 spaces need 2. 51 to 75 need 3. 76 to 100 need 4. The ratio keeps stepping up through 500 spaces, after which it moves to 2 percent of the total.
One in every six accessible spaces has to be van-accessible, and any lot with accessible parking needs at least one van space. A van stall is either 132 inches wide with a 60-inch access aisle, or 96 inches wide with a 96-inch aisle. Car-accessible stalls run 96 inches wide with a 60-inch aisle.
There is a distinction here that catches owners out. Repainting existing stall lines where they already sit is treated as normal maintenance. Resurfacing or sealcoating the lot, or adding spaces, is treated as an alteration, and an alteration has to bring the accessible parking up to the current scoping table. That means a sealcoating job can carry an obligation that a straight restripe does not. Worth knowing before the scope is set, not after.
Local fire marshal requirements sit on top of all this and vary across metro Atlanta jurisdictions. Worth a call before the layout is finalized.
2. Choosing the Wrong Parking Lot Striping Paint
Hardware store traffic paint and commercial traffic paint are not the same product, and the difference shows up around month eight.
Most commercial lots in Georgia are striped with waterborne traffic paint. It dries fast, carries low odor, and holds up well when applied at the right thickness. That last part is where jobs go wrong. Waterborne traffic paint is typically specified around 15 mils wet. Spray it light to stretch a bucket, and you have roughly halved the life of the line.
High-wear areas can justify a different product entirely. Thermoplastic and methyl methacrylate cost more per linear foot and last considerably longer through drive aisles, entrances, and loading zones where tires scrub the same line all day.
If a bid comes in noticeably under the others, ask what product is going down and at what thickness. That is usually where the gap is.

3. Striping Over Pavement That Was Never Cleaned
Paint bonds to pavement, not to what is sitting on top of it.
Red clay dust, spring pollen, the oil drip under the stall where the same delivery van parks every morning. Any of it between the paint and the asphalt, and the line peels in sheets instead of wearing down evenly.
Oil spots are the worst offender, and the one skipped most often. They need degreasing, and usually a primer before paint goes near them. A blower pass is not surface prep.
There is also a timing rule that gets ignored. Fresh asphalt needs roughly 30 days to cure before it will take striping. A freshly sealcoated surface needs 24 to 48 hours. Stripe early and the paint is sitting on oils that are still working their way out.
4. Letting Traffic Back On Before the Paint Cures
Dry to the touch and cured are different states.
Waterborne paint can feel dry in 30 minutes and still track under a tire. Humidity is the variable that catches people out, and metro Atlanta has no shortage of it. A humid afternoon can stretch cure time well past what the crew planned for that morning.
In practice, it looks like this: a tenant moves a cone, drives across a fresh stall line, and now there is a tire smear baked into the lot until the next restripe.
Cones and tape are cheap. A crew that leaves without barricading the work, or a property manager who pulls the cones early to keep tenants happy, usually pays for it twice.
5. Laying Out the Lot Without Measuring First
Restriping over the ghost of the old layout is the default on most jobs, and most of the time it is fine. It stops being fine when the old layout was wrong, or when the building’s use has changed.
An office building converted to medical suites needs more accessible parking than it had. A retail center that added a drive-thru tenant needs the queue lane marked so it stops backing into the drive aisle. Neither shows up if the crew traces what was already there.
Measuring first also tends to find space. Nine-foot stalls with 24-foot drive aisles are the common setup for 90-degree commercial parking, but lots laid out decades ago often run wider than they need to. Tightening them within code can add usable spaces without touching a single piece of asphalt.

Before You Approve the Next Striping Bid
Three questions get you most of the way: what paint, at what thickness, and who measured the layout.Appell Striping works with commercial property managers across metro Atlanta on striping and ADA-compliant stall layouts, and on restriping as part of a maintenance schedule. Our crews measure before they paint and tell you what is going down on your lot.
If your lines are fading or your property has changed since the layout was set, that is the point to have someone walk it. Here is how quickly markings wear down in this climate.